Bengaluru and Mumbai could get a faster overnight rail connection from November 2026. South Western Railway has reportedly proposed November 1, Karnataka Rajyotsava, for the inaugural Bengaluru-Mumbai Vande Bharat Sleeper Train. The proposed 1,118-km journey would take approximately 16 hours, compared with around 22 hours on the existing Udyan Express.
The expected train will accommodate 823 passengers in 16 air-conditioned coaches, with indicative ticket prices ranging from ₹2,684 to ₹4,250. However, Indian Railways has not officially confirmed the launch date, final timetable, or fares as of October 22, 2026.
Key Highlights
- November 1, 2026, is the proposed inaugural date, not a confirmed commercial launch.
- The train could cover 1,118 km in approximately 16 hours.
- Expected ticket prices range between ₹2,684 and ₹4,250.
- The 16-coach train is planned to accommodate 823 passengers.
- Proposed stops include Raichur, Kalaburagi, Solapur, Pune and Kalyan.
Bengaluru-Mumbai Vande Bharat Sleeper Launch Date: Is November 1 Confirmed?
South Western Railway sources have indicated that an inaugural special run could take place on November 1. Regular passenger operations may begin later, although no official commencement date has been notified.
Railway Minister Ashwini Vaishnaw had already announced plans for the sleeper connection on May 17, 2026, during the inauguration of a separate Bengaluru-Mumbai Express service. The Railway Ministry’s official announcement confirms the proposed sleeper connection without specifying its starting date.
The November inauguration could reportedly be affected by the model code of conduct linked to Karnataka Legislative Council elections.
There is also a practical issue. Railway sources suggest that only one rake may initially be available for the inaugural journey, while regular operations in both directions require additional arrangements.
Proposed Bengaluru-Mumbai Vande Bharat Sleeper Route, Stops and Timings
The proposed train may run between Sir M Visvesvaraya Terminal (SMVT Bengaluru) and Chhatrapati Shivaji Maharaj Terminus (CSMT Mumbai).
Reported intermediate stops include:
- Andhra Pradesh: Anantapur and Guntakal
- Karnataka: Raichur and Kalaburagi
- Maharashtra: Solapur, Pune and Kalyan
The final stop list remains unconfirmed. Some reports also identify KSR Bengaluru rather than SMVT as the departure station.
One proposed timetable places Bengaluru’s departure at 7:50 PM, with arrival in Mumbai at 11:55 AM the following day. The return train could leave Mumbai at 8:10 PM and reach Bengaluru at 11:55 AM.
These timings have not been approved for public booking.
The difference could be substantial for overnight passengers. Against the Udyan Express journey of roughly 22 hours, the new service could save around six hours. Actual savings will depend on the final route and operational timetable.
Bengaluru-Mumbai Vande Bharat Sleeper Ticket Prices and Booking Details
Early fare estimates suggest ₹2,684 for AC three-tier, ₹3,466 for AC two-tier and ₹4,250 for AC first class. These are reported estimates, not confirmed fares for this route.
Indian Railways explained in its March 11, 2026, fare clarification that Vande Bharat Sleeper fares are calculated per passenger-kilometre, with AC three-tier priced at ₹2.40 per kilometre before GST. Final ticket prices can include applicable charges.
The new service would also differ from conventional sleeper bookings. Vande Bharat Sleeper trains do not offer Reservation Against Cancellation (RAC) accommodation. Waitlisted passengers receive confirmed berths only when availability permits.
Bookings for the Bengaluru-Mumbai service have not been officially announced. Passengers can use IRCTC’s official booking portal to check fares and availability once reservations open.
Vande Bharat Sleeper Features: What Passengers Can Expect
The planned 16-coach configuration includes 11 AC three-tier coaches with 611 berths, four AC two-tier coaches with 188 berths, and one AC first-class coach with 24 berths.
The Railway Ministry’s technical specifications describe several features of Vande Bharat Sleeper trainsets:
- Safety: KAVACH train protection, CCTV surveillance, and fire detection systems.
- Comfort: Cushioned sleeping berths, improved suspension and ergonomic ladders.
- Convenience: Automatic doors, sealed gangways and emergency communication units.
- Efficiency: Regenerative braking and centralised coach monitoring.
These are trainset specifications; the final facilities for the Bengaluru-Mumbai service will depend on the rake assigned.
India’s first Vande Bharat Sleeper service began commercial operations between Howrah and Kamakhya on January 22, 2026. Its inaugural commercial journey sold out within hours of reservations opening, according to the Railway Ministry.
For Bengaluru-Mumbai passengers, the next development to watch is the official timetable notification. Until then, November 1 remains a proposed inauguration date.
FAQs
Has Indian Railways confirmed November 1 as the launch date?
No. South Western Railway has reportedly proposed an inaugural run on November 1, 2026. A formal railway notification and regular-service start date remain awaited.
Where will the Bengaluru-Mumbai Vande Bharat Sleeper start?
Reports indicate Sir M Visvesvaraya Terminal in Bengaluru and CSMT in Mumbai. Some reports name KSR Bengaluru, so the final departure station remains uncertain.
How much might an AC three-tier ticket cost?
One proposed fare is ₹2,684 for AC three-tier. Indian Railways has not issued the final route-specific fare chart, so the actual price may differ.
How long will the new train take?
Current proposals indicate approximately 16 hours from Bengaluru to Mumbai. The service could save around six hours compared with Udyan Express, subject to the approved timetable.
When will Bengaluru-Mumbai Vande Bharat Sleeper reservations open?
Booking dates have not been announced. Once reservations open, passengers can check the official IRCTC platform for ticket prices, train timings, and berth availability.
Don’t Miss These Latest Railway Updates!
1. Which Mangaluru–Bengaluru Trains Faced Disruptions?
Find out which train services faced cancellations or diversions and how passengers were affected.
2. Where Are 100 Festival Trains Running?
Check out Indian Railways’ 100 special trains planned to manage festival travel demand.
3. Why Were 120 Delhi Trains Affected?
Uncover the reported route changes, delays and rescheduling affecting 120 Delhi trains.
4. Could Vande Bharat Transform Freight Deliveries?
5. Which Vande Bharat Routes Cost More?
Browse Vande Bharat train routes, travel timings and ticket prices listed for 2025.


